Carolina Demo & Removal · NC and SC
Industrial & Plant Demolition
- Licensed in NC & SC
- $1M / $2M insured
- Haul-off and dump ticket in the price
Quick quote (888) 643-4199
Get a number for your industrial demolition job
Name, number and county. We reply with a price range and your permit answer.
Prefer a fast answer? Call (888) 643-4199.
We handle plant teardown, silo demolition, infrastructure demolition, equipment removal, including teardown, haul-off and legal disposal, at any address in North Carolina or South Carolina, for retail, offices, warehouses, and full commercial or industrial structures.
Typical projects in NC and SC run $9 – $25 per sq ft . The number is set by what the building held. Contaminated ground, heavy machinery pads and multi-storey reinforced concrete push past $25 per sq ft. Exact price, permit jurisdiction and equipment for your site are confirmed per job. Call (888) 643-4199 and we tell you the range before you commit to anything.
What an industrial demolition job includes
Site visit or photo review, and an honest read on access for machinery.
Commercial utility disconnect letters, environmental/asbestos clearance coordination, and COI documentation on request.
State notifications where required: 10-working-day advance asbestos notice applies to covered demolitions through SCDES (SC) and NC DHHS HHCU (NC).
Teardown, haul-off, and disposal at a legal C&D site, with the receipt.
The job shapes this takes
A machine pad and its foundations
Pads poured for a specific machine are thicker and more heavily reinforced than a floor slab, and the anchor bolts have to be dealt with. This is often the heaviest single item on a site clearance.
Buildings that held something
The rate stops describing the job once contents are involved. Process residue, underground lines, sumps and storage all change the method before they change the price.
Multi-storey reinforced concrete
Requires sequence, engineering and often a dismantling method rather than a push. This is the top of the per-square-foot range and above it.
Site clearance after a teardown
Hardstanding, kerbs, drainage runs, fencing and the foundations of everything that stood on the yard. Quoted as its own package so the handover condition is unambiguous.
Before we come, do this
- Provide whatever drawings, previous surveys or hazardous material records already exist.
- Isolate and cap process services properly, with the responsible party named for each.
- Establish the handover condition in writing: cleared to grade, or ready for a new slab.
- Confirm access routes for heavy plant and for loaded haulage across the site.
- Identify anything intended for salvage or return to service before demolition starts.
What is not in the number
Every contractor should be able to say this list out loud. If nobody has told you it before you sign, ask.
- Process decontamination and waste characterisation, which are specialist scopes.
- Ground investigation, remediation treatment and disposal of classified waste.
- Removal or relocation of plant and machinery owned by the client.
- Engineering design for temporary supports or method statements requiring a structural engineer.
- Any work on live services. Nothing proceeds until isolation is confirmed by the responsible party.
Where we do this work
Every county in both states. Recent and regular areas include:
- Industrial Demolition in Easley, SC
- Industrial Demolition in Abbeville, SC
- Industrial Demolition in Anderson, SC
- Industrial Demolition in Arkwright, SC
- Industrial Demolition in Bamberg, SC
- Industrial Demolition in Belton, SC
- Industrial Demolition in Bishopville, SC
- Industrial Demolition in Boiling Springs, SC
- Industrial Demolition in Branchville, SC
- Industrial Demolition in Aberdeen, NC
- Industrial Demolition in Apex, NC
- Industrial Demolition in Atlantic Beach, NC
- Industrial Demolition in Banner Elk, NC
- Industrial Demolition in Bell Arthur, NC
- Industrial Demolition in Bethlehem, NC
- Industrial Demolition in Brices Creek, NC
Before you call about industrial demolition
Money
What industrial demolition costs, and what moves it
Paperwork
Who issues your permit, county by county
Trust
Licenses and insurance we will send before you sign
Jobs that usually come with this one
One question comes up on every industrial demolition job and no one asks it until the truck is loaded: where the material is allowed to go (a site needs a construction and demolition permit to take it). It is a licensing question more than a distance question, which is why we name the site before the load leaves rather than after.
Quote request with photos (888) 643-4199
Get a number for your job
Give us the best number to reach you and where the structure sits. Add photos if you have them.
Prefer a fast answer? Call (888) 643-4199.