Asbestos Removal on Demolition and Renovation Jobs (Class I and Class II)

  • Licensed in NC & SC
  • $1M / $2M insured
  • Haul-off and dump ticket in the price

Quick quote (888) 643-4199

Get a number for your asbestos removal job

Name, number and county. We reply with a price range and your permit answer.

Prefer a fast answer? Call (888) 643-4199.

On a teardown, the asbestos question is usually the one that decides the schedule. We do the removal work that demolition actually requires, file the notification ahead of it, and say plainly which asbestos jobs we do not take.

Exact price, permit jurisdiction and equipment for your site are confirmed per job. Call (888) 643-4199 and we tell you the range before you commit to anything.

The classes we take, and the one we do not

In scopeClass I · II

  • Class I asbestos work: removal of thermal system insulation and surfacing ACM/PACM
  • Class II asbestos work: removal of ACM that is not TSI or surfacing, including wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics
  • Notification filing ahead of the work where we are the responsible party

Not offeredClass III

  • Class III asbestos work: repair and maintenance operations that disturb ACM. We do not take those jobs.
  • The pre-demolition inspection and bulk survey, which is a separate accredited role

Class definitions are from 29 CFR 1926.1101(b), OSHA asbestos construction standard, class definitions. State notifications and accreditation rules are published by NC DHHS Health Hazards Control Unit and SCDES Bureau of Air Quality. The classes describe what kind of asbestos work a job is, and they decide the notification, the controls and who may legally do it.

Licensed & insured in NC & SC We hold active NC & SC demolition and asbestos abatement credentials and send our license documentation and certificate of insurance before you sign. See our credentials page.

The job shapes this takes

Before a teardown on an older building

Structures from before the mid-1980s commonly carry asbestos in floor tile and mastic, pipe and boiler insulation, siding, textured coatings and some wall assemblies. Testing comes before breaking, and a result changes the method, the disposal route and the paperwork.

During a job, when something is found

The most expensive moment in any demolition is discovering regulated material mid-work. Work stops, the material is assessed, and the notification and handling requirements attach. Saying what the building is made of at the start is cheaper than finding out later.

On a renovation where the frame stays

Class I and Class II work covers removal and the demolition-adjacent operations. Where the building stays standing and the work becomes repair or maintenance, the class changes, and Class III or IV work is not ours.

Before we come, do this

  • Tell us the build decade and what you think the materials are.
  • Provide any previous survey or test result, so it is not paid for twice.
  • Clear access and remove occupancy from the affected area before anything starts.
  • Confirm which agency covers your address for the notification, and let us file it.
  • Plan for the lead time. A South Carolina notification runs at least 10 working days ahead of teardown.

What is not in the number

Every contractor should be able to say this list out loud. If nobody has told you it before you sign, ask.

  • Class III and Class IV asbestos operations. These are not services we take.
  • Encapsulation, air monitoring and clearance testing where a separate licensed or independent party is required.
  • Lead paint, mold and rodent remediation, which are different trades and different rules.
  • Any work that begins before the required notification period has run.
  • Emergency response to a disturbance that has already happened without a plan.

Where we do this work

Both states, crew and equipment routed by job. The notification is filed with whichever agency covers your address. Some of the places we work:

Before you call about asbestos removal

Money

What asbestos removal costs, and what moves it

Paperwork

Who issues your permit, county by county

Trust

Licenses and insurance we will send before you sign

Jobs that usually come with this one

tearing the building down once it is clear usually quoted with asbestos removal a commercial interior take-out usually quoted with asbestos removal pipe and tank insulation on a pad usually quoted with asbestos removal historic building demolition and deconstruction usually quoted with asbestos removal

One question comes up on every asbestos removal job and no one asks it until the truck is loaded: where the material is allowed to go (a site needs a construction and demolition permit to take it), and the eight things that never go in a haul-off (they decide the price before the size does). It is a licensing question more than a distance question, which is why we name the site before the load leaves rather than after.

Quote request with photos (888) 643-4199

Get a number for your job

Give us the best number to reach you and where the structure sits. Add photos if you have them.

Prefer a fast answer? Call (888) 643-4199.

Call Now Get Quote